Ruaya Al-Dar Executes Water Network Installation and Extension Project in Tabuk Region

As part of its commitment to strengthening vital infrastructure, Ruaya Al-Dar has successfully executed the installation and extension of water distribution networks across several key locations in the Tabuk region, in full compliance with the highest technical standards and engineering specifications in the water sector.

Scope of Work:

Installation and extension of primary and secondary water pipelines using high-quality, pressure-resistant, and environmentally durable materials.
Excavation, leveling, and backfilling works to ensure the safety and continuity of water flow.
Installation of valve chambers and control units in accordance with engineering designs for operational efficiency and ease of maintenance.
Integration of new networks with existing systems without disrupting ongoing water services.
Hydraulic testing and pressure calibration to verify the performance and integrity of the system.

Project Objectives:

The project aims to expand the reach and efficiency of water distribution networks, ensuring reliable water delivery to the targeted areas, and meeting the growing needs of the population while improving service quality.

Our Commitment:

At Ruaya Al-Dar, we are dedicated to implementing our projects with the highest standards of safety, sustainability, and operational excellence, minimizing water loss and enhancing system reliability, in alignment with the goals of Saudi Vision 2030 to improve quality of life and infrastructure development.

left
Previous Project

Building and Villa Projects: Luxury Standards and Exceptional Quality

Next Project

**Government Hospitality Building Project – Amanah of Tabuk Region**

right

Related Projects

Explore more of our outstanding projects that reflect our commitment to quality and innovation

More Projects
العربية English